Shipping Times for Custom Prints Explained Plainly
Custom prints are made after you order, so the clock starts in production, not at checkout. Here is how the timeline breaks down and where delays actually happen.
A custom print order typically takes 7 to 14 business days door to door. Production runs about 3 to 5 business days, then tracked delivery adds roughly 4 to 9 business days depending on destination. International orders can take longer. Order at least three weeks ahead if the print is needed for a specific date.
Production Comes Before Shipping
The honest answer is that a custom print has two clocks, not one. The first is production. The file is prepared, the edition is printed, and the ink is given time to set before the work is inspected and packed. That stage usually runs three to five business days. Nothing ships until it is finished, and no carrier upgrade can shorten it.
This matters most for anyone ordering against a deadline. A birthday or a housewarming does not wait for a print run. The practical rule is to place the order at least three weeks before the date you need it, which absorbs a slow production day and a slow carrier without drama. Framed pieces can take a day or two longer than unframed canvas, since the frame is assembled after printing.
Format changes the timeline slightly. A canvas edition such as a large coastal scene ships stretched and protected, while a framed poster goes out glazed and boxed. Both are tracked from dispatch, so the tracked delivery timeline for custom prints is visible rather than guessed at (S1).
What Happens After Dispatch
Once the parcel leaves the workshop, the carrier takes over. Domestic deliveries typically land within four to nine business days of dispatch. International destinations add time, and customs can add more. Tracking updates at each scan, which is the main reassurance available when a date matters.
Delays, when they happen, come from a small set of causes. Weather closes a hub. A parcel sits in customs. An address is incomplete and the carrier holds the shipment. None of these are visible at checkout, which is why the tracking number matters more than any estimate given at checkout.
If a print is a gift, plan the reveal around the tracking, not around the estimate. A framed poster like a quiet shoreline piece (P2) reads as finished goods the moment it is unboxed, but only if it arrives with days to spare. A canvas edition of a landscape (P3) ordered for an event needs the same buffer. When in doubt, order earlier and read the guide to choosing between canvas and framed prints (A3) before you commit.
Where timelines slip
- Production queues run longer in peak gifting seasons
- Customs inspection adds days on international parcels
- Incomplete addresses hold shipments at the local depot
- Framing adds assembly time after the print itself is done
Planning Around a Fixed Date
Work backwards from the day the print needs to be on a wall. Subtract the delivery estimate, then subtract production, then add a week of slack. If the math gets tight, the honest options are a smaller format, which prints and ships faster, or a digital gift announcement with the print following later.
It is also worth knowing what you are buying before you wait for it. A large still life canvas (P1) and a smaller framed work occupy different amounts of wall and different amounts of patience, and the sizing guide for small living rooms (A4) settles that choice before money is spent. If the question is really about finding the work in the first place, the overview of where to buy Manookian prints online (A1) covers the market.
One caveat belongs here. Estimates are estimates. Carriers publish ranges, not promises, and a responsible answer says so rather than promising a date nobody controls. The buffer week is not caution for its own sake. It is the difference between a gift that arrives early and an apology sent by message.
No carrier upgrade can shorten the time ink takes to dry.
| Stage | Typical duration | Notes |
|---|---|---|
| Production | 3 to 5 business days | Printing, drying, inspection, packing |
| Domestic delivery | 4 to 9 business days | Tracked from dispatch |
| International delivery | 7 to 14 business days | Customs can add time |
| Recommended lead time | 3 weeks | Covers slow stages on both ends |
Typical timeline for a custom print order
Key takeaways
- A custom print order typically takes 7 to 14 business days door to door.
- Production takes 3 to 5 business days and cannot be rushed by faster shipping.
- Order at least three weeks before any date the print must arrive for.
- Tracking begins at dispatch, so the delivery stage is always visible.
Related questions
Can I speed up production on a custom print order?
Production time is mostly fixed. Printing, drying and inspection each take the time they take, and rushing any of them shows in the finished piece. Faster shipping shortens only the delivery stage, which is usually the smaller half of the total. The reliable way to be early is to order early.
Do framed prints take longer to ship than canvas prints?
Usually by a day or two. A framed piece is assembled after the print is made, so framing adds a step canvas does not have. Framed work also travels in more protective packaging, which can add handling time. The difference is small but real when a deadline is close.
What happens if my print arrives late or damaged?
Tracking identifies where a delay occurred, and carriers take responsibility for parcels lost or damaged in transit. Damage on arrival is a replacement situation, not a lost purchase. Order early enough that a replacement could still be produced and shipped if the worst happens, which is another argument for the buffer week.
From the Auvrique collection
Made to order · Every sizeEvery size, every country, delivery included
Editions are made to order and shipped worldwide. Choose a format and a size, and the price you see is the price you pay.
View the collectionPart of our guide to how your order is made and shipped.



