Framed Poster Delivery Times Explained Before You Order
Made-to-order framing runs on a production clock, not a warehouse clock. Here is the realistic window, what slows it down, and how to plan around a fixed date.
A framed poster ordered made to order typically arrives within two to three weeks. Production takes three to five business days, then shipping adds another five to ten. Around December, add roughly a week to both stages. If your event is closer than two weeks out, order a print that ships already framed from stock instead.
The Realistic Timeline From Order to Door
A framed poster is not pulled off a shelf. It is printed, dried, framed and packed after the order comes in, which is why the honest answer is a range rather than a date. Count on three to five business days for production. Then add five to ten business days for transit, depending on where the parcel is headed. Two to three weeks end to end is the number to plan around.
That window holds whether the edition is a Roszak-style modernist study or a landscape like the River Avon framed poster, because the process behind it is the same. What changes the total is rarely the artwork. It is the calendar. Orders placed in mid November or the first week of December routinely slip, and a deadline that felt comfortable in October can feel tight by then.
If the date matters, work backwards from it. Give yourself three weeks minimum, four in peak season, and treat anything less as a gamble rather than a plan.
What Slows a Framed Order Down
Three things push a delivery past its estimate. Peak season volume is the first, and it is the one most people underestimate. Carriers and workshops both run at capacity in December, so a job that takes four days in September can take eight. The second is frame choice, since wider mouldings and larger sheets add handling time at the bench.
The third is an address problem, which is also the easiest to prevent. An incomplete postcode, a missing apartment number or a typo in a name will hold a parcel at a depot for days. Check the shipping line twice before you pay. It costs nothing and it is the single most common cause of a late gift.
For a date-sensitive order, the safer route is a canvas edition, which needs no framing step and moves faster through production. The Garden Behind the House canvas is one example, and the trade-offs between formats are covered in how to choose between canvas and framed poster.
Ways to protect a deadline
- Order at least three weeks before the date, four if it falls in December.
- Choose a standard size and a simple frame moulding to keep production short.
- Double-check the delivery address and recipient name before paying.
- Consider an unframed or canvas option if the window is under two weeks.
Planning Around a Gift or Event Date
Most people asking this question are buying for a specific day, and the arithmetic matters more than the artwork. Mark the date, subtract three weeks, and that is your last sensible order date. In December, subtract four. If the math does not work, it is better to know before paying than after.
One honest caveat. Auvrique does not currently list Theodore Roszak editions, so a Roszak framed poster specifically is not something to order here today. The timelines described above apply to the editions that are available, such as the Summer Storm canvas print, and to any artist added to the catalogue later. For questions about a specific order, the Auvrique shipping policy sets out the current production and transit windows.
If the piece is for a living room rather than a deadline, the subject matter guide at common subjects in Theodore Roszak's paintings is a better place to start than the calendar.
The frame is the slow part. The print was ready days before the box was.
| Stage | Business days | Notes |
|---|---|---|
| Production and framing | 3 to 5 | Longer for large sheets or wide mouldings |
| Transit | 5 to 10 | Varies by destination and carrier load |
| Peak season buffer | Add 5 to 7 | Mid November through late December |
Typical framed poster timeline
Key takeaways
- Plan on two to three weeks from order to delivery for a framed poster.
- December orders should carry an extra week on both production and transit.
- Address errors are the most common and most avoidable cause of delay.
- Canvas editions skip the framing step and arrive sooner when a deadline is tight.
Related questions
How fast can I get a Theodore Roszak print?
If an edition is in stock and already framed, it can ship within days. Made-to-order framed posters take two to three weeks, and canvas prints usually land in the middle of that range. Note that Auvrique does not currently list Theodore Roszak editions, so check the catalogue for what is actually available before counting on a date.
Do framed posters ship faster at certain times of year?
Yes. Orders placed outside November and December move at the standard pace of roughly two to three weeks. Peak season adds volume at both the framing bench and the carrier, so the same order can take an extra week or more. Ordering early in the season is the only reliable fix.
Can I pay for faster shipping to hit a deadline?
Expedited shipping shortens transit, not production. If the framing bench is backed up, a faster carrier will not help much. The better lever is choosing a format with less handling, such as a canvas print, or ordering early enough that the production window is not the bottleneck.
From the Auvrique collection
Made to order · Every sizeEvery size, every country, delivery included
Editions are made to order and shipped worldwide. Choose a format and a size, and the price you see is the price you pay.
View the collectionPart of our guide to how your order is made and shipped.
Sources: Auvrique Shipping Policy



